Streamer  enters Belorussian market
see details >>

 
 

LFA technical specifications entered in the Transneft  register.
see details >>

 
  LFAs to be used in designing and building railway electroengineering devices
see details >>
 

   
LFA-L LFA-M-10 LFA-M-10-C LFA-S-10 LFA 20kv LFA 35kv
 


There was scientific and technical seminar “Lighting Protection for Russian Oil and Gas Industry” in St-Petersburg on July 16-17, 2009.
The Organizer of the seminar was Streamer Electric Inc which is leading Russian researcher, developer and producer of lighting protection facilities. Details>>

Sport news
Mr. Ivan Zhitenev (Streamer Electric Inc, CEO) has successfully finished TRANSALP - the most complicated and breathtaking cycle race for amateurs of sport. Our company is really proud of this achievement!
The challenge consist of 7 route legs, 883 km length, 18 alpine passes, 18 366 meters of total climb.



It may be recalled that Streamer Electric Inc is wellknown as competition sponsor for such sport events:
- All-Russian children "Vladimir Drachev Prize" biathlon competition;
- Toksovo round;
- Toksovo cycle marathon.In addition, Streamer Electric Inc has old-standing relations (as sponsor and partner) with St.Petersburg Biathlon Federation.

June 2009. Dear  Sirs,
Here  you  may  download  our brochure that contains all the essential information  of the new technology of lightning protection of overhead lines  rated  at  3-35  kV  and  above  with the help of multi-chamber arresters  (MCA)  and  multi-chamber  insulator-arresters  (MCIA).

3-35kV.pdf

May 2009. The system  has  been  showed  during  2009 WORLD CONGRESS & EXHIBITION ON INSULATORS, ARRESTERS & BUSHINGS. Details>>

October 2007. We have built 100 000 lightning arresters! Details>>

October 2007. Streamer started delivery of its products to the Belarus Republic. Details>>


September 2007 Streamer took part in the 4th International Symposium “Eltrans’2007” (St. Petersburg), “Power Supply System Reliability” Conference (Moscow), and the 12th International Specialized Exhibition “Energy Expo 2007” (Minsk).Details>>


September 2007. Streamer started preparations for the exhibition “Russian Electric Networks – 2007” (Power Lines – 2007) to be held at the All-Russian Exhibition Center (Moscow) from 4 through 7 December 2007. See exposition layout here >>


July 2007. In accordance with the oil and gas industry technological normative requirements, LFA technical specifications were registered and entered in the Transneft register.


June 2007. An album of drafts describing LFA installation for railroad overhead AC supplying lines was published. The working drawings developed by the "Roszheldorproekt" joint-stock company were approved and put into operation by the Electrification and power supply department of the Russian Railways joint-stock company.


May 2007. Streamer took part in the 14th International Specialized Exhibition “Power engineering and Electrotechnology – 2007 (St. Petersburg) and the International Congress on Isolators, Arresters, and Bushings in Rio de Janeiro, Brazil.


March 2007. On 27th February 2007 the stockholders meeting elected Streamer’s new General Manager Igor Vladimirovich Ivanov, to assume office on 1st March 2007.


November 2006. The Federal Network Company’s inter-departmental commission approved three new types of 10 kV LFAs: stub long-flashover arrester (LFA-S), modular type LFAs with 1.5 m surface flashover length (LFA-M-1.5), and modular type LFAs for compact overhead lines  (LFA-M-- К).


previous news>>